| 1 cuota de $365.000 sin interés | CFT: 0,00% | TEA: 0,00% | Total $365.000 |
| 2 cuotas de $222.066 | Total $444.132 | |
| 3 cuotas de $152.545,67 | Total $457.637 | |
| 6 cuotas de $82.721,17 | Total $496.327 | |
| 9 cuotas de $60.699,50 | Total $546.295,50 | |
| 12 cuotas de $49.938,08 | Total $599.257 | |
| 24 cuotas de $34.375,40 | Total $825.009,50 |
| 3 cuotas de $157.144,67 | Total $471.434 | |
| 6 cuotas de $86.267,75 | Total $517.606,50 | |
| 9 cuotas de $64.552,28 | Total $580.970,50 | |
| 12 cuotas de $52.867,21 | Total $634.406,50 |
| 3 cuotas de $157.594,83 | Total $472.784,50 | |
| 6 cuotas de $88.129,25 | Total $528.775,50 |
| 18 cuotas de $38.673,78 | Total $696.128 |
(Si sos residente de Tierra del fuego accedes a un 20% de descuento, con envio obligatorio.Consultanos antes de realizar tu orden)
ENVIOS A TODO EL PAIS
TODAS LAS MODALIDAD DE PAGO
IVA INCLUIDO
2 DIAS HÁBILES PARA INFORMAR CAMBIOS
10% OFF EFECTIVO - Comunicate al 153.608.5996
The BAUER Vapor Flylite sets new standards in safety and comfort on the ice. Its innovative three-piece design, featuring a specially developed anatomical shape, provides an extremely low profile that feels barely noticeable. The flexible bicep with a molded PE insert offers optimal protection while allowing maximum freedom of movement. The forearm is well protected with 360° all-around coverage made from Curv Composite. For a perfect fit that stays in place, an additional Wrap-Lock strap ensures secure support. The breathable Thermo Core Zero interior material provides a comfortable wearing experience and maintains a pleasant climate during play.
Key Features at a Glance:
Cap: Three-piece construction with a new anatomical shape and low profile
Upper Arm: Flexible bicep with molded PE insert for protection and mobility
Forearm: 360° all-around protection with Curv Composite and an extra Wrap-Lock strap
Fastening: Dynaflex Comfort Strap for a secure and comfortable fit
Los equipos de proteccion de Bauer Hockey, Inc estan cubiertos contra defectos de fabricación y mano de obra durante un período de 90 dias a partir de la fecha de compra
